Queen Margaret Drive, Glasgow

PBSA Structural Warranty

Project Overview

Queen Margaret Drive is a £21.74 million purpose-built student accommodation (PBSA) development in Glasgow, being delivered by Kelvin Properties.

The seven-storey scheme will provide 134 student accommodation units, with a basement accommodating plant and back-of-house facilities. The development incorporates a light gauge steel structural system, brick cladding and off-site manufactured bathroom pods.

J3 Advisory was appointed to arrange Structural Warranty insurance for the development, including 24 months’ Loss of Rent cover, with a focus on securing an A-rated insurer experienced in the PBSA sector.


Client

Kelvin Properties

Location

10 Kelbourne Street, Glasgow

Sector

Purpose-Built Student Accommodation (PBSA)


Services

Structural Warranty

The Challenge

The development required a Structural Warranty suitable for the PBSA market, with cover that would meet the requirements of the developer and future institutional stakeholders.

The construction methodology also needed to be considered as part of the insurer’s technical assessment. The scheme incorporates a load-bearing light gauge steel system supplied by Kingspan, piled foundations and prefabricated bathroom pods, alongside a basement and blue roof system.

In addition to the standard structural warranty requirements, Kelvin Properties required 24 months’ Loss of Rent protection, making the scope of cover and insurer selection particularly important.

Our Role & Outcome

J3 Advisory approached the insurance market to identify a suitable A-rated provider capable of accommodating the development’s construction methodology and PBSA-specific requirements.

Following a review of the available options, J3 recommended HDI Global SE, whose commercial policy wording and experience of institutional developments were well suited to the scheme.

The insurance arrangements include Structural Warranty protection alongside 24 months’ Loss of Rent cover, with Pick Everard appointed to undertake technical inspections throughout construction.

With the scheme now progressing on site, J3 continues to work alongside Kelvin Properties and the wider project team as the development moves towards its anticipated completion in 2027.