Mercat Building, Glasgow

Structural Warranty

Project Overview

Mercat Building is an £8 million conversion project in central Glasgow, involving the redevelopment of an existing listed office building into 39 residential apartments and one commercial unit.

Located on Gallowgate, the scheme will bring a new residential use to an existing building while retaining its historic character.

J3 Advisory was appointed to advise on the Structural Warranty requirements, taking into account the building’s listed status, existing structure and proposed change of use.


Client

Developer

Location

Glasgow

Sector

Residential / Mixed-Use


Services

Structural Warranty

The Challenge

Converting an existing listed building into residential accommodation presents different considerations from a conventional new-build development, particularly when arranging Structural Warranty insurance.

For Mercat Building, the proposed conversion required consideration of the existing structure, the extent of the planned works and how the retained elements would be treated under the warranty.

The building’s listed status added a further consideration, with the proposed redevelopment needing to account for the constraints associated with a protected property.

The requirement was therefore to identify a suitable warranty solution for the residential conversion, with the scope of cover and technical requirements considered alongside the proposed construction programme.

Our Role & Outcome

J3 Advisory was appointed to advise on the Structural Warranty requirements for the £8 million development.

Our involvement focused on reviewing the proposed conversion, considering the implications of the existing and retained structure, and engaging with suitable warranty providers to establish an appropriate insurance solution.

This included considering the technical information required by insurers and how the warranty arrangements would accommodate the building’s change of use from offices to residential accommodation.

J3’s involvement supports the developer in progressing the warranty requirements alongside the wider redevelopment programme, with practical completion currently anticipated in 2028.